With the halfway mark passed, Day 5 of the RS400 Frostie Series begun with a cold morning in the dinghy park. The woolly hats were donned as the mist across the lough was lifting.
With the halfway mark passed, Day 5 of the RS400 Frostie Series begun with a cold morning in the dinghy park. The woolly hats were donned as the mist across the lough was lifting.
Leave a Reply